This task encapsulates the essence of the UPTUN project, namely, the evaluation and upgrading of the safety level of existing tunnels - both at the component level and holistically - in an integrated fashion consistent with the safety levels established in this project as a whole. In that respect, this work-package brings together all the various strands from the other work-packages and will therefore inevitably require input from, and collaboration with, all the partners of this major project.